Kitchen Remodeling – Day 2 of 17 – Demolition of Cabinets and Floor

This video goes through the majority of the kitchen demolition process, including the tear down of all cabinets, demolishing the tile floor down to the slab foundation, and removing some sheetrock and backsplash.
This was our first full day of work on the kitchen remodel. My brother Neil (in Gray) and I (in Green) are joined by two other helpers as well, and we quickly progress through the demolition process.
Tools used: Dewalt Reciprocating Saw, Dead On Tools Annihilator Wrecking Bar, 3M Respirators, Dewalt 20V Drill and Impact Driver, Bosch Oscillating Tool, WEN 3410 Air Filtration System, Neiko Demolition Hammer, Bosch 11255VSR Rotary Hammer, Bosch SDS Tile Chisel Bit, Ridgid Wet/Dry Shop Vacuum


  1. Reply
    MONEYBAGS603 January 11, 2018 at 1:06 pm

    why respirators? is there asbestos?

  2. Reply
    hotmoon226 January 11, 2018 at 1:06 pm

    Thank you. I am wondering what do you eat during the 17 days.

  3. Reply
    morland January 11, 2018 at 1:06 pm

    thanks for the upload, this really helps

Leave a reply

Excellent At Home
Register New Account
Reset Password