Kitchen Remodeling – Day 2 of 17 – Demolition of Cabinets and Floor

0



This video goes through the majority of the kitchen demolition process, including the tear down of all cabinets, demolishing the tile floor down to the slab foundation, and removing some sheetrock and backsplash.
This was our first full day of work on the kitchen remodel. My brother Neil (in Gray) and I (in Green) are joined by two other helpers as well, and we quickly progress through the demolition process.
Tools used: Dewalt Reciprocating Saw, Dead On Tools Annihilator Wrecking Bar, 3M Respirators, Dewalt 20V Drill and Impact Driver, Bosch Oscillating Tool, WEN 3410 Air Filtration System, Neiko Demolition Hammer, Bosch 11255VSR Rotary Hammer, Bosch SDS Tile Chisel Bit, Ridgid Wet/Dry Shop Vacuum